Prime Point, Blackburn

Blackburn

Introducing Prime Point, Blackburn

Works commenced April 2022 with completion in Q4 2023.

Overview

This latest development of two brand new industrial units is well located within close proximity to J4 M65 providing easy access to the M6 and M61 in 10 mins.

 

500 KVA Power Supply
Steel portal frame construction
Minimum 75 car parking spaces (4 disabled)
Eaves height 12m
Maximum yard depth 45m
Minimum yard depth 40m

Project Gallery

Why Prime Point, Blackburn?

EV Charging
Public Transport Links
Leisure Facilities Close By
Retail Outlets Close By
Central Location
Well connected to the national motorway network

Interested in any Prime project? Make an enquiry today and receive:

This latest development of two brand new industrial units is well located within close proximity to J4 M65 providing easy access to the M6 and M61 in 10 mins.

 

Prime Point, Blackburn

Introducing Prime Point, Blackburn

Works commenced April 2022 with completion in Q4 2023.

This is getting deleted

Download the prime brochure

Enter your details below to download the latest PRIME brochure.